| Project Bike 2002 Phantom STCX Wide Tire 113 Cubic Inch S&S Motor Gel Solo and Pillion Pad Chrome Triple Trees Fat Bob Rear Fender 60 Spoke Wheels Plus Many More Upgrade Options |
| First Step Frame has been Powder Coated Then Lay Out the Received Parts And Check in All Parts |
| Next Finger Tight assembly of Fenders, Tank and Seat After Rear Section Has Been Put in Finger Tight |
| More Assembly and Alignment of Parts ~ Finger Tight |
| Drill Holes for Fender, Mount to Struts, Set Tank...Does it all Fit ?? |
| Remove Fenders and Tank The Fuel Tank should be Pressure Tested Then Kreem inside the Tank Now the Body Work can Start |
| Assemble the Forks and Install Fork Cups Then put the Front Wheel in Place Set Up the Correct Spacing and Mount the Caliper and Set the Spacing |
| Primary Engine and Transmission Are Set in Place Aligned Then everything is Torqued or Tightened |
| After the Engine and Transmission are Done Then Align the Rear Tire And Final Drive Chain or Belt |
| At this point everything Should Be Aligned And All Fasteners Should Be Tight Be Sure To Use Loc-Tite (blue) |
| Stand back and look ~ Is everything Aligned? |
| Oil Tank can be Installed Handlebars and Controls Then the Clutch |
| It will Start to look like Your Dream Machine Soon 113 Cubic Inches of Ground Pounding Horsepower |
| Next Page You'll See Everything Coming Together |
|
|
|
| Phantom Cycle Inc |